Q 10
A tool hiring company has estimated that the rate of increase in the maintenance cost of power drills is given by the equation
C(t) = 2 + t1,5,
where t is the time that the company is in operation for weeks. Calculate the total maintenance cost during the first four weeks.
1. 10
2. 22.36
3. 20.8
4. 32.36
"C(t) = 2 + t^{1.5}"
Total maintenance cost during the first four weeks:
"TMC = \\int^4_0 (2 + t^{1.5} )dt\\\\\n\nTMC = 2t + \\frac{t^{2.5}}{2.5} \\\\\n\nt = 4 \\\\\n\nTMC = 2 \\times 4 + \\frac{4^{2.5}}{2.5} \\\\\n\n= 8 + 12.8 = 20.8"
Answer: [3] 20.8
Comments
Leave a comment