Q 10

A tool hiring company has estimated that the rate of increase in the maintenance cost of power drills is given by the equation

C(t) = 2 + t1,5,

where t is the time that the company is in operation for weeks. Calculate the total maintenance cost during the first four weeks.

 

1.      10

2.      22.36

3.      20.8

4.      32.36


Expert's answer

C(t)=2+t1.5C(t) = 2 + t^{1.5}

Total maintenance cost during the first four weeks:

TMC=04(2+t1.5)dtTMC=2t+t2.52.5t=4TMC=2×4+42.52.5=8+12.8=20.8TMC = \int^4_0 (2 + t^{1.5} )dt\\ TMC = 2t + \frac{t^{2.5}}{2.5} \\ t = 4 \\ TMC = 2 \times 4 + \frac{4^{2.5}}{2.5} \\ = 8 + 12.8 = 20.8

Answer: [3] 20.8