The side of a wooden cube with spgr of 0.58 is 200 mm. Compute the force needed to
completely submerge the wood in water.
A piece of wood floats in water with 55 mm projecting above the water surface. When placed
in glycerin of spgr = 1.32, the block projects 80 mm above the liquid surface. Determine the
following:
a. Height of the piece of wood
b. specific gravity of the wood
c. Weight of the wood if the cross section is 200 mm x 200 mm
Water is being heated in a closed pan on top of a range while being stirred by a paddle
wheel. During the process, 30 kJ of heat is transferred to the water, and 5 kJ of heat is lost
to the surrounding air. The paddle-wheel work amounts to 500 N · m. Determine the final
energy of the system if its initial energy is 10 kJ.
A can of pumpkin puree 8.73cm diameter by 11.43cm in height is being heated in a steam retort in which the steam pressure is 100 kPa above atmospheric pressure. The pumpkin has a thermal conductivity of 0.83Jm's "C", a specific heat of 3770Jkg and a density of 1090kgm³. The temperature in the can prior to retorting was 20°C. Plot out the temperature at the centre of the can as a function of time until this temperature reaches 115°C. Assume is very high
Y=1/2(3x^2+1)^2
Determine the force in each member of the truss shown. State whether each member is in tension or compression and tabulate the results.
2. Determine the moments of inertia Ix and Iy of the shaded area, with respect to an axis passing through GH
and FH respectively.
A house with 200-m2 floor space is to be heated with geothermal water flowing through
pipes laid in the ground under the floor. The walls of the house are 4 m high, and there are 10
single-paned windows in the house that are 1.2 m wide and 1.8 m high. The house has R-19
(in h · ft² · °F/Btu) insulation in the walls and R-30 on the ceiling. The floor temperature is
not to exceed 40°C. Hot geothermal water is available at 90°C, and the inner and outer
diameter of the pipes to be used are 2.4 cm and 3.0 cm. Design such a heating system for this
house in your area.
Avoid radiation (assume)
How to reduce time of development and manufacturing process while delivering on costumers'values?
How can we work more effectively and efficiently with vendors and suppliers?