Consider a nonpipelined machine with 6 execution stages of lengths 50 ns,
50 ns, 60 ns, 60 ns, 50 ns, and 50 ns.
i. Find the instruction latency on this machine.
ii. How much time does it take to execute 100 instructions?
i. Instruction latency = 50+50+60+60+50+50
= 320 ns
ii. Time to execute 100 instructions = 100*320
= 32000 ns
Comments
Leave a comment