Civil and Environmental Engineering Answers

Questions: 1 228

Answers by our Experts: 1 131

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search & Filtering

Find the solution of the given differential equation and then find the particular solution for which a point (x,y) is given:

dy/dx = (2-x) (x+1); (x,y) = (-1,3)
A stone is thrown downward with an initial velocity of 5m/s from a 20-meter high building. Find the time it takes to reach the ground.
Draw the isoclines with their direction markers and sketch several solution curves, including the curve satisfying the given initial conditions.
1) = ;

A pulley (A) diameter 300m is accelerated by means of a belt drive from 60rpm to 240rpm during 360 revolutions. Attached by means of a belt is another pulley (B) with diameter 200mm. Calculate

a) the angular acceleration of each pulley

b) the initial and final velocity of the smaller pulley (B) in rad/s


Draw the isoclines with their direction markers and sketch several solution curves, including the curve satisfying the given initial conditions.
1) = ;

The land surveyor is the one who recommends which bid the client should go with.

True or

False


During the Pre tender meeting, the involved parties exchange contract details, dicusses the project master programme

True or
False
Construction project undergoes the tender planning phases.

True or
False
Contract planning monitors progress of the project.
True or
False

The Pre tender stage is carried out by the contract manager

True or

False