Calculate the corrected speed in m/s of bromoform in a sand aquifer with hydraulic conductivity 0.0002 m/s and porosity 0.7. The flow path is 490 m, the hydraulic head is 4.1 m. The cross section of the flow is 38 m2. The retardation factor of bromoform is 1.9.
Comments
Leave a comment