Shiv want to lay a track 200 m long and 6 m wide using a team of 60 boys in 2 days. After 1 day, Shiv find 75 m x 6 m track has been laid. How many men should Shiv hire additionally if 2 men do the job of 5 boys?
6. Two impedances = ( 4 + j7 )Ω and z2 = ( 4 - 3j )Ω are connected in parallel determine:
a. the current flowing
b. its phase relative to the 120V supply voltage.
Total impedance for a parallel circuit is given by 1/Z = 1/Z + 1/Z2 and the current is given by I = V/Z
2. Using the formulae for geometric progression
(a) The value of a lathe originally valued at £9000 depreciates by 5% each year. Calculate its value after 6 years.
(b) The lathe will be sold when its value falls below £6000 after how many years will this happen?
3) A construction company is fined for each day of delay in the construction of a
bridge. The penalty for the delay is £3000 for the first day and then an additional
£500 for each subsequent day ( i.e. Day 1 £3000, day 2 £3500, day 3 £4000
etc.). The maximum fine the company can afford is £75000.
Use arithmetic sequences formulae to find the maximum number of days they can
afford to delay.
4) Simplify the following, using the rectangular form of complex numbers
5 + 2j / 7 - 3j and (5+ 3j) (-8-2j)
5) Simplify, using the polar form of complex numbers
a. 5 < 55 ^degree x 8 < - 28^ degree
b. 5 < 55 ^ degree / 8 < - 28 ^ degree
Convert both answers to rectangular form
Show that ((7+3sqrt5)/(sqrt2+sqrt7+3sqrt5)+((7-3sqrt5)/(sqrt2+sqrt7-3sqrt5))=2sqrt2
Shiv want to lay a track 200 m long and 6 m wide using a team of 60 boys in 2 days. After 1 day, Shiv find 75 m x 6 m track has been laid. How many men should Shiv hire additionally if 2 men do the job of 5 boys
Show step by step:
In Desmos, graph y= (-5x, 4y)
Show step by step:
Find the inverse for y=43sqaure root of x-2
Show step by step:
Find the inverse for y=(x-3)3+1
Show step by step:
Find the inverse for y= 2x2-8