Transnet had to have a control system in place that was able to accommodate change when they faced the disposal of non-core assets like Viamax, SAA and Metrorail. To which characteristic of an effective control system does this refer?
1 Integration
2 Flexibility
3 Accuracy
4 Timeliness
The answer to this question is Flexibility
Comments
Why the answer is flexibility
Leave a comment