Engineering Answers

Mechanical Engineering 2219
Electrical Engineering 1543
Civil and Environmental Engineering 1044
Chemical Engineering 846
Other 252
Material Science Engineering 57
3D CAD Modeling 51
Thermal Power Engineering 44

Questions answered by Experts: 6 056

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search

A foot-lever is 1 metre from the center of shaft to the point of application of 600 N load. Find: i) diameter of the shaft, ii) dimensions of the key, iii) dimensions of rectangular arm of the foot lever at 60 mm from the center of shaft assuming width of the arm as 3 times thickness. The allowable tensile stress may be taken as 75 N/mm2 and allowable shear stress as 70 N/mm2.


Draw the isoclines with their direction markers and sketch several solution curves, including the curve satisfying the given initial conditions.
1) = ;

Form the partial differential equation by eliminating the arbitrary function f from z=f(x2-y2)

Form the partial differential equation by eliminating the arbitrary function f from z=f(xy)

Form the partial differential equation by eliminating the arbitrary function from z2-xy=f(x/z)


The properties of a system, during a reversible constant pressure non￾flow process at p = 1.6 bar, changed from v1 = 0.3 m3/kg, T1 = 20°C to v2 = 0.55 m3/kg, T2 = 260°C.

The specific heat of the fluid is given by

cp = 1.5+74/(T+45)kJ/kg°c

, where T is in °C.


Determine : (i) Heat added/kg ;

(ii) Work done/kg ;

(iii) Change in internal energy/kg ;

(iv) Change in enthalpy/kg


The land surveyor is the one who recommends which bid the client should go with.

True or

False


During the Pre tender meeting, the involved parties exchange contract details, dicusses the project master programme

True or
False
Construction project undergoes the tender planning phases.

True or
False
Contract planning monitors progress of the project.
True or
False

The Pre tender stage is carried out by the contract manager

True or

False


Site layout planning is not really required, the contractor can utilise any available space provided, as long as it within the official handed over site

True or

False