A. There are specific tests that must be performed at the end of an installation State the purpose for performing each of the following tests:
i. Polarity test ii. Earth continuity test iii. Insulation resistance test
With the use of a neat diagram, show the main features of an electrical power system (Grid) typical to that of Jamaica giving appropriate voltages and a brief explanation of what happens at each stage from Power Station to Consumers' residence.
With the use of a suitable diagram explain how a person can get an electrical shock from touching an unearthed isolator, state a precaution that can be taken to prevent a reoccurrence.
Briefly explain the steps you would take if you witness someone experiencing an electrical Shock at the work place
List the FOUR (4) classes of fire with a brief explanation of each class.
Define fire. With the aid of the fire triangle list the fire possible methods one could employ to extinguish a fire.
List any FOUR (4) of the JS21 Regulations relating to safety
Explain the basic operation of a generator using a suitable diagram to support your answer.
The electric bill for a family for a month is $120.
a. Assuming 30 days in the month, what is the cost per day?
b. Based on 15-h days, what is the cost per hour?
c. How many kilowatthours are used per hour if the cost is 12¢/kWh?
d. How many 60 W lightbulbs (approximate number) could you have on to use up that much energy per hour?
e. Do you believe the cost of electricity is excessive?
Recommend an entity relationship diagram for the database 'bhashaoDB'