Write a report on how to perform an experiment to determine the density of water
A boat company makes three different kinds of boats. All boats can be made profitability but the company’s monthly production is constrained by limited amount of labour, wood and screw available each month. The director will choose the combination of the boats that maximazes his revenue in the view of the information given in the following table
Four buildings (B1, B2, B3 and B4) are to be constructed by four different contractors (C1, C2, C3 and C4). Each contractor has submitted the bid for the four buildings. The bid amount has been shown below. The problem is to determine which building is to awarded to each contractor, so as to keep the cost of construction of four building optimum.
Four buildings (B1, B2, B3 & B4) are to be constructed by four different contractors (C1, C2, C3 & C4).each contractor has submitted the bid for the four buildings. The bid amount has been shown below. The problem is to determine which building is to be awarded to each contractor, so as to keep the cost of four building optimum
CONTRACTOR
Building C1 C2 C3 C4
B1 48 48 50 44
B2 56 60 60 68
B3 96 94 90 85
B4 42 44 54 46
Reduce the following game by dominance & find the value of the game.

I II III IV
I 3 2 4 0
II 3 4 2 4
III 4 2 4 0
IV 0 4 0 8
Four buildings (B1, B2, B3 & B4) are to be constructed by four different contractors (C1, C2, C3 & C4).each contractor has submitted the bid for the four buildings. The bid amount has been shown below. The problem is to determine which building is to be awarded to each contractor, so as to keep the cost of four building optimum
CONTRACTOR
Building C1 C2 C3 C4
B1 48 48 50 44
B2 56 60 60 68
B3 96 94 90 85
B4 42 44 54 46
Solve the following LP problem using graphical method
Maximize Z=5X1+2X2
Subject to
2X1+7X2 <= 100
3X1+8X2 <=135
X1 & X2 >=0
After taking more than 100 samples from a process that produces pipes, the length of the pipe was determined to have a mean and a standard deviation of 0.973 and 0.003 meter, respectively. The process is in good statistical control and the individual lengths seem to follow the normal distribution.
Dev cpp programme to find "total numbers of array elements".
A particle moves along a straight line such that at any instant t in seconds,the displacement s in metres is given by the equation s=t^3+15t^2+63t-40.
Find the distance covered by the starting point to the point when the particle is momentary at rest.
Find the velocity of the particle when acceleration is zero