Suppose the a firm has the production Q=2K^0.5L^0.5
Assume that the capital is fixed at nine units (ie K=9?). If the priceof output p is 6 per unit and wage rate w is Rs 2 per unit, determined the optimal or maximizing rate of labour to be hired. What labour rate is optimal if the wage rate increased to Rs 3 per unit