My orders
How it works
Examples
Reviews
Blog
Homework Answers
Submit
Sign in
How it works
Examples
Reviews
Homework answers
Blog
Contact us
Submit
Fill in the order form to get the price
Subject
Select Subject
Programming & Computer Science
Math
Engineering
Economics
Physics
Other
Category
Statistics and Probability
Calculus
Differential Equations
Quantitative Methods
Discrete Mathematics
Financial Math
Real Analysis
Abstract Algebra
Linear Algebra
Complex Analysis
Functional Analysis
Differential Geometry | Topology
Combinatorics | Number Theory
Analytic Geometry
Operations Research
Other
Deadline
Timezone:
Title
*
Task
*
{"ops":[{"insert":"JOY leather, a manufacturer of leather Products, makes three types of belts A, B and C which are processed on three machines M1, M2\n\u00a0and M3\n. Belt A requires 2 hours on machine(M1)\n\u00a0and 3 hours on machine (M2)\n\u00a0and 2 hours on machine (M3). Belt B requires 3 hours onmachine (M1)\n, 2 hours on machine (M2)\n\u00a0and 2 hours on machine (M3)\n\u00a0and Belt C requires 5hours on machine (M2) \nand 4 hours on machine (M3)\n. There are 8 hours of time per dayavailable on machine M1\n, 10 hours of time per day available on machine M2\n\u00a0and 15 hoursof time per day available on machine M3\n. The profit gained from belt A is birr 3.00 per unit,from Belt B is birr 5.00 per unit, from belt C is birr 4.00 per unit. What should be the daily\u00a0production of each type of belt so that the profit is maximum? \na)\nFormulate the problem as LPM\nb)\nSolve the LPM using simplex algorithm.\nc)\nDetermine the range of feasibility, optimality and insignificance\nd)\nInterpret the shadow price\n"}]}
I need basic explanations
Special Requirements
Upload files (if required)
Drop files here to upload
Add files...
Account info
Already have an account?
Create an account
Name
*
E-mail
*
Password
*
The password must be at least 6 characters.
I agree with
terms & conditions
Create account & Place an order
Please fix the following input errors:
dummy