My orders
How it works
Examples
Reviews
Blog
Homework Answers
Submit
Sign in
How it works
Examples
Reviews
Homework answers
Blog
Contact us
Submit
Fill in the order form to get the price
Subject
Select Subject
Programming & Computer Science
Math
Engineering
Economics
Physics
Other
Category
Statistics and Probability
Calculus
Differential Equations
Quantitative Methods
Discrete Mathematics
Financial Math
Real Analysis
Abstract Algebra
Linear Algebra
Complex Analysis
Functional Analysis
Differential Geometry | Topology
Combinatorics | Number Theory
Analytic Geometry
Operations Research
Other
Deadline
Timezone:
Title
*
Task
*
{"ops":[{"attributes":{"bold":true},"insert":"1.\u00a0\u00a0\u00a0\u00a0\u00a0JOY leather"},{"insert":", a manufacturer of leather Products, makes three types of belts A, B and C which are processed on three machines M"},{"attributes":{"script":"sub"},"insert":"1"},{"insert":", M"},{"attributes":{"script":"sub"},"insert":"2"},{"insert":" and M"},{"attributes":{"script":"sub"},"insert":"3"},{"insert":". Belt A requires 2 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"1)"},{"insert":" and 3 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"2)"},{"insert":" and 2 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"3"},{"insert":"). Belt B requires 3 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"1)"},{"insert":", 2 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"2)"},{"insert":" and 2 hour on machine (M"},{"attributes":{"script":"sub"},"insert":"3)"},{"insert":" and Belt C requires 5 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"2) "},{"insert":"and 4 hours on machine (M"},{"attributes":{"script":"sub"},"insert":"3)"},{"insert":". There are 8 hours of time per day available on machine M"},{"attributes":{"script":"sub"},"insert":"1"},{"insert":", 10 hours of time per day available on machine M"},{"attributes":{"script":"sub"},"insert":"2"},{"insert":" and 15 hours of time per day available on machine M"},{"attributes":{"script":"sub"},"insert":"3"},{"insert":". The profit gained from belt A is birr 3.00 per unit, from Belt B is birr 5.00 per unit, from belt C is birr 4.00 per unit. What should be the daily production of each type of belt so that the profit is maximum?\n"},{"attributes":{"bold":true},"insert":"a)\u00a0\u00a0\u00a0\u00a0\u00a0"},{"insert":"Formulate the problem as LPM\n"},{"attributes":{"bold":true},"insert":"b)\u00a0\u00a0\u00a0\u00a0"},{"insert":"Solve the LPM using simplex algorithm.\n"},{"attributes":{"bold":true},"insert":"c)\u00a0\u00a0\u00a0\u00a0\u00a0"},{"insert":"Interpret the shadow prices\n\n"}]}
I need basic explanations
Special Requirements
Upload files (if required)
Drop files here to upload
Add files...
Account info
Already have an account?
Create an account
Name
*
E-mail
*
Password
*
The password must be at least 6 characters.
I agree with
terms & conditions
Create account & Place an order
Please fix the following input errors:
dummy