My orders
How it works
Examples
Reviews
Blog
Homework Answers
Submit
Sign in
How it works
Examples
Reviews
Homework answers
Blog
Contact us
Submit
Fill in the order form to get the price
Subject
Select Subject
Programming & Computer Science
Math
Engineering
Economics
Physics
Other
Category
Electrical Engineering
Mechanical Engineering
Civil and Environmental Engineering
Chemical Engineering
3D CAD Modeling
Material Science Engineering
Thermal Power Engineering
Other
Deadline
Timezone:
Title
*
Task
*
6.You are tasked with managing the construction of a promenade at Umhlanga. Many times, during the construction process, it is required that sand slurry be pumped to different locations on the construction site. The pipeline that transports the sand slurry is manufactured from mild steel. In this particular scenario based only on the information given, what type of corrosion would you expect to occur? Select one: a. Galvanic Corrosion b. Erosion Corrosion c. Cavitation Corrosion d. Stress Corrosion e. None of the options 7.A car-body-panel stamping machine applies a load of 7.4 tons to the mould beneath its stamping ram. The mould is held in place with four tool steel bolts of 12mm diameter. The machine usually stamps 2500 body panels per month. Use the S-N diagram below to predict after approximately how many years the bolts will be expected to break.
I need basic explanations
Special Requirements
Upload files (if required)
Drop files here to upload
Add files...
Account info
Already have an account?
Create an account
Name
*
E-mail
*
Password
*
The password must be at least 6 characters.
I agree with
terms & conditions
Create account & Place an order
Please fix the following input errors:
dummy