A 15-kilowatt motor is used to hoist an 800 kg bucket of concrete to the 20th floor of a building under construction to height of 90 m. assuming no energy is lost along the process, how much time is required?
"work done, mgh=power (P)\\times time(t)"
"mgh=P\\times t"
"800\\times9.8\\times90=15\\times1000 \\times t"
"t=(800\\times9.8\\times90)\/15000=47.04seconds"