A 15-kilowatt motor is used to hoist an 800 kg bucket of concrete to the 20th floor of a building under construction to height of 90 m. assuming no energy is lost along the process, how much time is required?
workdone,mgh=power(P)×time(t)work done, mgh=power (P)\times time(t)workdone,mgh=power(P)×time(t)
mgh=P×tmgh=P\times tmgh=P×t
800×9.8×90=15×1000×t800\times9.8\times90=15\times1000 \times t800×9.8×90=15×1000×t
t=(800×9.8×90)/15000=47.04secondst=(800\times9.8\times90)/15000=47.04secondst=(800×9.8×90)/15000=47.04seconds
Need a fast expert's response?
and get a quick answer at the best price
for any assignment or question with DETAILED EXPLANATIONS!
Comments