A 15-kilowatt motor is used to hoist an 800 kg bucket of concrete to the twentieth floor of a building under construction to height of 90 m. assuming no energy is lost along the process, how much time is required?
Upward force needed =bucket's weight =(mg)
800"\u00d7" 9.8=7,840N
Power available (P)=1.0 × 15×103W=1.5×104W
Since P="\\frac{W} {t} =\\frac{Fs} {t}"
Therefore ;"t=\\frac{7,840\u00d790} {1.5\u00d710^4}"
=470.4 seconds