Math Answers

Statistics and Probability 15585
Calculus 6937
Algebra 6391
Discrete Mathematics 3312
Differential Equations 3311
Geometry 2041
Financial Math 1916
Linear Algebra 1803
Trigonometry 1580
Analytic Geometry 1496
Abstract Algebra 1183
Other 1109
Real Analysis 965
Combinatorics | Number Theory 564
Complex Analysis 547
Operations Research 423
Quantitative Methods 373
Differential Geometry | Topology 260
Integral Calculus 224
Vector Calculus 162
Functional Analysis 161
Matrix | Tensor Analysis 53
Differential Geometry 17
Commutative Algebra 1

Questions answered by Experts: 50 414

Need a fast expert's response?

Submit order

and get a quick answer at the best price

for any assignment or question with DETAILED EXPLANATIONS!

Search

A coin is tossed, and the random variable X is the number of heads that appear. Use H to represent the head and T to represent the tai


The area between z = -2.40 and z = 1.15 is

If the x̄ =87 and the s=7, the z−score that corresponds to a score X=102 is

Given the score X=72, σ=4 and z=1.64, the value of μ is

Suppose an average of  5 cars arrive at the parking lot every  15 minutes. What is the probability that exactly  4 cars will arrive in the next  15 minutes?


Draw Dienes blocks to show how to find solution to


78+54


102-45

Suppose that a pair of fair dice are to be tossed and let x the random variable denote the sum of the points.

compute the expected value

the variance of X

the standard deviation of x


The Star hotel was burned down in a fire and the manager decided to accommodate the guests in 4–person and 8-person tents. The tents were to be hired at a cost of Kshs 1,500 and Kshs 4,500 per night respectively, the space available could accommodate at most 13 tents and the manager had to cope with at least 64 guests. Required Formulate this as a linear programming model that could be used to determine the number of tents of each type that could pull up in order to minimize the overall cost. (10 Marks)



  1. ) The following table shows the number of units produced each month and the total incurred.


MONTH UNITS COST

JUNE 200 50,000

JULY 500 75,000

AUGUST 300 55,000

SEPTEMBER 800 95,000

OCTOBER 700 80,000

NOVERMBER 600 80,000

DECEMBER 400 60,000


Required

              I. Estimate the variable cost per unit and the fixed cost per month use high low method. (6mks)


             ii.  Calculate the regression line Y= a+bx (6mks)



(b) Explain four purpose of transfer pricing (8mks)




Explain the following concepts using examples:


i. Mutually exclusive events. (3 Marks)


ii. Independent events. (3 Marks)


LATEST TUTORIALS
APPROVED BY CLIENTS