i) The high and low points are chosen by activity, not by cost.
Total Cost = Fixed Cost + Variable Cost
(Variable Cost) ⁄ unit = (Change in Cost) / (Change in Activity)
Variable Cost / unit = (-590) / 960 = -$0.61 / unit Fixed Cost = Total Cost - Variable Cost
Fixed Cost = 110- (-0.61)*1240 = $866.40
Fixed Cost = 700 - (-0.61)*(280) = $870.80y=868.60−0.61x
x=1256:y=868.60−0.61∗(1256)
y = $102.44
ii)
Xmean=6900/8=862.5
Ymean=5400/8=675b1=(4318400−6900∗5400/8)/(6642000−(6900)2/8)
b1=−0.49b0=Ymean−b1∗Xmean
b0=1098.41
y=b0+b1∗x
y=1098.41−0.49x
x=1256:y=1098.41−0.49∗(1256)
y = $482.97