To state whether the following is true or false with a short proof or a counter example in support of the answer :
The following 4/3/F/F_ max problem can be reduced to a machine problem:
Job Processing time (in hours) on
M₁ M₂ M₃
1 8 6 10
2 5 2 13
3 4 11 11
4 6 7 10
Yes The following max problem can be reduced to a machine problem.
Consider we have 4-job, 3-machine shop as shown in the diagram below-
"x_i=m_1+m_2\\\\y_i=m_3+m_2"
Idle time of machine 1 =46-25=21 min
Idle time of machine 2=46-24=22 min
Idle time of Machine 3=46-38=12min
So, Above problem can be reduced to machine problem.