To excavate for a basement, 7m by 12m, a man had the earth removed to a depth

of 3m. How much did this cost at Php 100 per cubic meter of earth removed?


1
Expert's answer
2021-11-24T06:36:17-0500

Volume of earth removed "=7m\u00d712m\u00d73m"

"=252m^3"


Cost of Excavation ="Php(100\u00d7252)"


Cost of Excavation="Php 25,200"