Consider a 4/2/F/Fmax problem with the job processing time as given below:
Job Processing time on
Machine1 Machine2
A 6 10
B 8 5
C 14 8
D 7 2
i) Find the optimal sequence of jobs. ii) Find the total elapsed time.