Answer to Question #205353 in Management for Siyamthanda

Question #205353

N Composing Its MRP Plan, Suppose The Operations Management (OM) Receives An Order For 1 000, 3-Blade Fans. A Fan Is Composed Of 4 Major Components, Namely: •A Fan Motor •A Pedestal •A 4 – Switch Assembly And 2m Electric Cord. •A Safety Fan Guard OM Has The Following Items In Stock: Fully Assemble Fans: 120;, Fan Motors: 90;, 4–Switch Assemblies: 70;, Pedestals: 80;, Safety Fan Guards: 150;, And Electric Cords 240m. Question 3a: Do The Following Gross To Net Calculations: •The Net Requirements For 4-switch assembles

1
Expert's answer
2021-06-13T19:07:02-0400

The switching capacity of the switch = Number of ports * Rate of the port *2 (full-duplex)

24*1000*2= 48Gbps.