quick screen is a clothing manufacturing company that specialized in producing commemorative shirts immediately following major sporting events such as the world cup, Olympic,etc. The items produced include two sweatshirts, one with silk-screen printing on the front and one with print on both sides, and two t shirts of the same configuration. The company has to complete all production within 72 hours after the game, at which time a trailer truck will pick up the shirts. The company will work around the clock. The truck has enough capacity to accommodate 1200 standard size boxes. a standard size box hold 12 T-shirts, and a box of 12 sweatshirts is three times the size of a standard box. The company has budgeted $25000 for the production run. It has 500 dozen sweatshirts and T-shirts each in stock,
ready for production. this scenario is illustrated in the following.
T-shirt (500) Sweethearts (600)
front ($25/dz) Back/front ($36/dz)
1
Expert's answer
2012-09-14T08:38:47-0400
Dear visitor What do you need to be done? Please, give us the details so we could help you
"assignmentexpert.com" is professional group of people in Math subjects! They did assignments in very high level of mathematical modelling in the best quality. Thanks a lot
Comments