Question #234149

25. How do engineer determine the number of cells for concrete box girder bridges?


Expert's answer

Engineers determine the number of cells for concrete box girder bridges by considering the depth of concrete box girder bridge.


In a situation where the depth of concrete box girder bridge goes above or exceeds 1/6 or 1/5 of the total bridge width, then they consider a single-cell box girder bridge to be appropriate The primary concern is to assess how deep the concrete girder bridge is when making this decision.