Transnet had to have a control system in place that was able to accommodate change when they faced the disposal of non-core assets like Viamax, SAA and Metrorail. To which characteristic of an effective control system does this refer?
1 Integration
2 Flexibility
3 Accuracy
4 Timeliness
2 Flexibility
Comments
Leave a comment