A flood control district can construct several alternative control works to alleviate
flooding. These alternatives include the construction of dam A, dam B, and a system of
levees C. Each of these works can be built to function alone or together with any other or
all other projects. Thus we have a possibility of the following combinations: ABC, A, B,
C, AB, AC, and BC. The life of each dam is 80 years and the life of the levee system is
60 years. The cost of capital is 4%. Information on total investment, operation and
maintenance costs, and average annual flood damages is given in the table. Which flood
control undertaking is the most economical using incremental cost-benefit analysis?
ABC seems to be more economical since the combination may take a single initiative on other measures. Considering the fact that they are all combined, the initiative may call for a stronger control machines. However, the equipment may be cheaper compared to when the company purchases a single one for each one.